NCTL IN KULA CLUSTER
Project information

In 2008 Anpez Centre for Environment and Development was commissioned by SPDC to work with various communities in Kula kingdom in the implementation of diverse need based community development project with supporting funds from SPDC NCTL (Nembe Creek Trunk Line) Replacement Project. Kula Kingdom is situate in Akukutoru Local Government Area of Rivers State, Nigeria, it is made up of 4 main communities of Kula, Boro, Offoinama and Belema and 2 satellite communities of Kongoama and Lucky land.

Anpez carried out Need Assessment of the communities using the SLA/PRA approach after which, a five year development plan emerged for the communities. Subsequent development intervention that has so far been carried out in these communities were based on the Community Development Plans.  As part of the mentoring process the communities in the cluster were groomed to perform the following roles:

  • Setting up of a committee known and referred to as Community Trust (CT) who will manage the process at the community level. The CT is made up of all interest group within the community.
  • Formation of CDB (2 representatives of each CT within the cluster, and other stakeholders) the 2 CT reps are the chairmen and secretaries.
  • Project identification and implementations
  • Negotiate the signing of the Memorandum of Understanding (MoU).
  • Ensuring that peace and tranquility reigns in their area
  • Ensuring there will be no shut-down of operation due to restiveness, etc
  • Believe the ability of the people they have presented, in the areas they are to serve
  • Provide enabling environment for SPDC operations in the community
  • Attract other stakeholders to invest in the community and the NCTL process.

Anpez also facilitated the setting up of the Cluster Development Board (CBD).The CDB is made up of the Chairmen and Secretaries of the CTs from the communities making up the cluster.
The board have sub committees such as (i) Finance & Management Committee(FMC) made up of all the CTs chairmen, SPDC & NGO.(ii)Technical Committee(TC) made up of all the CT secretaries, SPDC & NGO for effective administration of the process.
See below for the hierarchy:

  • Chairman
  • Secretary
  • Vice Chairman
  • Treasurer
  • Fin. Sec.
  • PRO
  • Other members

In three years the six communities have witnessed a high and unprecedented level of development that were envisioned, designed and delivered by the community people themselves. The impact of the NCTL is felt in all communities and households across Kula Cluster communities.

The projects and activities that were carried out in the cluster in the last three years are captured in the table below whilst pictorial presentations of the projects are captured in a latter part of this publication.


S/N

Project Community

Project

1

Belema

Construction of Comm. Hall

2

Belema

Community Toilet

3

Belema

Treated Mosquito Nets

4

Belema

2  Nos 75HP speed boats

5

Boro

Construction of Comm. Hall

6

Boro

Renovation of Boro Ancestral House in Kula

7

Boro

Community Toilet

8

Boro

Local Shore Protection

9

Offoinama

Community Toilet

10

Offoinama

Construction of Community Hall

11

Offoinama

75 HP Speed Boat

12

Offoinama

Youth Training/ Empowerment Scheme

13

Offoinama

Community Water Scheme

14

Kula

6 Units Teachers Quarter

15

Kula

4 Units Teachers Quarter

16

Kula

75 HP Speed Boat

17

Kula

Treated Mosquito Nets

18

Kula

Renovation of 6 c/r & Sc Lab

19

Kula

Renovation of 6 c/r, Principal's Off, VP, &Staff Room

20

Kula

Provision of a 15 seater Toyota Hiace Bus

21

Kula

Installation of 1 no 500kva Perkins Power Gen set

22

Kula

Rehabilitation of Water Treatment Facility

23

Kula

Provision of 420 school desks/chairs for KSSC

24

Kula

Provision  of two 2000 litres overhead tanks, laying of pipes for water distribution (21 points)in and outside KCSS .7km

25

Kula

Equipping the KCSS computer lab

26

Kula

Construction of a .258km Walk Way

27

Kula

Construction of 5 units self contain NYSC Lodge

28

Kula

Repair & Installation of a 2nd 1no 500KVA Perkins Gen. set (ADDENDUM)

29

Kula

Provision of a 30 seater Toyota Coaster Bus

 
Projects in Picture
 
LAND TRANSPORTATION SCHEME
 
MARINE TRANSPORTATION SCHEME
 
COMMUNITY WATER SCHEME
 
RENOVATED 6 CLASSROOM BLOCKS
 
TREATED MOSUQUITO NETS / INSTALLED 500KVA GEN SET